Details

<-- Request a quote today -->

Architecturally Correct, Long Lasting and Elegant!

Mounting brackets and screws for one top rail, one side and one bottom rail, one side. For one section of railing between two newel posts or columns, two mounting bracket kits would be required. One for the left, and another for the right.


Rail Connection Hardware Info:

Determine the placement of your top rail and bottom rail. The information you will need to do this is:
- Height of baluster (not including pipe)
- Height of the bottom rail
- Distance of bottom rail from the substrate (surface). Locate the following components from your hardware kit:
- Aluminum angles (4 per newel post)
- 1/4" Hex Head Bolt (x8) or 1/4" threaded rod (x4)
- 1/4" Hex Head Nut (x8)
- Lock washers (x8) Mark the position of the aluminum angle on the face of the newel post. Keep in mind that the angles mount to the underside of the rails. Drill (4) four 1/4" dia. holes in the locations where the brackets are to be mounted. Be sure the holes pass through the uPVC pipe of the newel post. Secure the brackets to the newel post as indicated in the diagram with bolts, washers and nuts provided in the hardware kit.
 
NOTE: This item must be primed and painted.

More Information

Product Info

Price15.99
ManufacturerDelphi Columns

Product Attachments

Video

Reviews

Product Questions